Manage software license pools
A software license pool records software licenses purchased by the organization and helps compare them with usage identified from endpoint reports. It is separate from Ping64 product licensing and does not replace activation or license management by the software vendor.
The page alone cannot establish license compliance. The organization must still verify purchase terms, version restrictions, measurement method, actual usage, and data completeness. Creating a pool or recording a key does not activate software with the vendor.
Before you begin
- Use an administrator account with permission to view Software. Creating, editing, changing status, and handling assignments require the corresponding management permissions; revealing a key also requires the relevant export permission.
- Use purchasing records to identify the software identifier, applicable version, license metric, quantity, and validity period. Software ID is required when creating a pool. If unsure, ask the platform administrator or technical support rather than guessing from the software name.
- Confirm that target endpoints are enrolled and their software information has been collected and reported. Use Software Assets to check endpoint distribution first. Unreported or unprocessed data can affect identification.
- If keys must be recorded, establish the organization's key-handling and approval procedures. Do not share plaintext keys through shared screens, ordinary tickets, or public documents.
Create a license pool
- Switch to Software, open Software Licenses, and select New License Pool.
- In Basics, enter the pool name, Software ID, and applicable edition or SKU. Select the contractual metric: seat, device, user, or concurrent. Purchase types include perpetual, subscription, volume, OEM, and free. Software ID is required; selections must match the contract.
- In Seats & Time, enter the total, priority, and applicable effective and expiration times. The total cannot be negative; when both dates are set, the effective time must be earlier. The page identifies smaller priority values as higher priority. For concurrent licensing, also choose the measurement window and current-concurrent or peak-in-window metric.
- A total of zero is displayed as an infinity symbol. Do not interpret this as an unlimited entitlement from the vendor. Enter and verify the contractual quantity to avoid obscuring overuse risk.
- In Scope & Confirm, review the scope and notes. The form offers whole tenant, department, and endpoint list, but has no input for selecting specific departments or endpoints. If a specific scope is required, contact technical support to confirm an available configuration and its effect; selecting a scope type alone does not establish that the scope is complete.
- Review the summary and save. Reopen the pool details to check the software, metric, quantity, dates, and scope, then compare identified usage with endpoint reports and purchase records.
For example, for a device-based contract, use the number and scope of devices stated in the contract rather than substituting the number of employees. The contract governs the actual terms.
Check the form values and times: entering 0 for priority resets it to 100, and entering 0 for the concurrent window resets it to 60 minutes. Effective and expiration times are entered and displayed in the management device’s local time; verify the actual instant when working across time zones. Reopen after saving and check these values against the contract and management requirements.
For a new pool, the default expiration grace period is 30 days. Review and adjust it against the contract and organizational procedures. A grace period does not extend the vendor’s entitlement. After expiration and the grace period, subsequent system processing may mark the pool expired and release its active assignments; verify the actual timing and results. For concurrent pools, automatic identification does not create ordinary assignments or pending reviews. An empty list does not prove there was no concurrent use; check the relevant overview, collection status, and contract.
Review, change, and release assignments
Find a pool by keyword or metric in Software Licenses. Open its details to review basic information, keys, assignments, identification evidence, and audit records. Identification depends on endpoint data, reporting, and processing; missing evidence does not prove that the software was unused.
Before enabling, disabling, or editing a pool, assess the effect on related statistics and business processes. Before releasing an assignment, verify the object and business impact. Releasing a console record does not uninstall software or recover the vendor-side license. Check the assignment and identification results afterward and verify endpoint state if necessary.
Record and reveal keys
- If required, open the pool's Keys tab and choose Add key.
- Enter the plaintext key, select its type, and provide the activation limit and notes based on the license information. The plaintext value is required. Save and check the list and operation result.
- Before revealing plaintext, verify the required permission, a suitable operating environment, and authorized recipients. Assess business impact and follow organizational approval before revocation. Recording or revoking a console key record does not mean its vendor-side status has changed.
Handle pending reviews
Open Review Queue from Software Licenses. Examine the object, software, candidate pools, and queue time by conflict reason. Before processing, verify the contract, candidate-pool status, scope, and remaining capacity. For an item that should be assigned, select the record and the correct candidate pool, choose Confirm, then check each pending item and the pool's assignment records. A completion message does not guarantee that every selected item was assigned successfully.
Caution: Selecting an item can also select a candidate pool. In that state, choosing Ignore can result in a license assignment. If an item needs to be ignored, contact technical support first to confirm a safe procedure; afterward check assignment and audit records. Do not infer the result from the button label alone.
An item without a candidate pool may appear unchecked yet still be included in the submission. Do not rely on the checkbox alone to determine the submitted scope. If you cannot verify the selected items, contact technical support for a safe procedure before submitting, and check each result afterward.
Troubleshooting
- Save fails: Check Software ID, total, effective and expiration times, permissions, and the page message.
- Usage differs from purchasing records: Compare contractual measurement, pool settings, endpoint collection and reporting, and identification evidence. Do not assess compliance using one number alone.
- Department or endpoint scope is unexpected: Confirm whether specific objects were fully configured; the current form has no input for choosing them.
- Items remain pending after processing: Check candidate-pool status, capacity, and assignments; contact technical support if needed.
Updated